Cochecho River Draw Down begins October 11th
Department Posting:Community Services
posted on:10/06/2009 |
 |
The Operator of the Dam, located on the Cocheco River in downtown Dover, will begin a draw down of the river level behind the dam. The Operator of the Dam will be performing maintenance during this draw down period.Draw down will begin on October 11, 2009 and it is anticipated work will be completed by October 17, 2009. River levels are expected to return to normal shortly thereafter. If you have any questions, do not hesitate to contact 516-6450.
|
|